Jump to content

Ibrox Maintenance


Ace

Recommended Posts

  • 2 weeks later...
On 02/04/2019 at 16:11, Ace said:

The horrible yellowing translucent sheets at either end of the broomloan/Copland stands, they'll be removed & replaced with something more opalescent that's will let in far more light.

Will they  be fitting blue, white and red disco lights for the big UEFA league preliminary qualifying round nights too. 

Link to post
Share on other sites

The old lady is fantastic considering last upgrades were in the mid nineties. I think having broomloan/Copeland sides all glass (like st James park)or clear plastic would enhance the ground. Then if we start turning on the style on the pitch we have the ability to expand....agree with everyone about removing corner TVs and get capacity up to about 53000 in due course.

Link to post
Share on other sites

2 minutes ago, Rlm said:

The old lady is fantastic considering last upgrades were in the mid nineties. I think having broomloan/Copeland sides all glass (like st James park)or clear plastic would enhance the ground. Then if we start turning on the style on the pitch we have the ability to expand....agree with everyone about removing corner TVs and get capacity up to about 53000 in due course.

Juventus is ‘the old lady’ and It’s  Copland not Copeland, also St James Park is a shithole.

We don’t need to turn the style on to have the ability to expand, we have a 13 thousand waiting list and we’ve been pish for years.

Apart from that good post mate 🤣

 

Link to post
Share on other sites

56 minutes ago, Rlm said:

The old lady is fantastic considering last upgrades were in the mid nineties. I think having broomloan/Copeland sides all glass (like st James park)or clear plastic would enhance the ground. Then if we start turning on the style on the pitch we have the ability to expand....agree with everyone about removing corner TVs and get capacity up to about 53000 in due course.

Wow bump the crowd up by just over 2000 by taking out the tellys. 

Link to post
Share on other sites

1 minute ago, Rlm said:

Might take it up to 55k with them screens out guessing.

It will depend on how it's done. If they leave the supports for the SJ roof it reduces if they are taken it will be a major engineering project. 

Link to post
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Restore formatting

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Upcoming Events

    • 30 March 2024 15:00 Until 17:00
      0  
      Rangers v Hibernian
      Ibrox Stadium
      Scottish Premiership
×
×
  • Create New...